Tuesday, 21 May 2013

Questionaries’ to Client Plant Maintenance


 Questionaries’ to Client Plant Maintenance 

A.Organization
1. Plant Maintenance
1.1. Maintenance Planning Plant
Questions:
Q: 1) How maintenance will be planned within your company?
A:
1.2. Maintenance Plant
Questions:
Q: 1) Do you want to set up plants specfically for maintenance requirements (in addition to
the common logistics plants)?
A:
Q: 2) How is capacity planning performed in your maintenance plants?
A:
Q: 3) How are maintenance spares stored?
A:
1.3. Plant Section
Questions:
Q: 1) Are certain types of maintenance work planned or executed with consideration to the
plant sections?
A:
1.4. Location
Questions:
Q: 1) Do you subdivide your maintenance plant in locations to facilitate the maintenance job
or for purpose of reporting?
A:

1.5. Maintenance Planner Group
Questions:
Q: 1) How is maintenance work organized?
A:
Q: 2) How are the maintenance teams / labor resources organized?
A:
B.Master Data
1. Plant Maintenance
1.1. Technical Objects (Structuring of Technical Systems)
Questions:
Q: 1) How should your technical systems be structured?
A:
Q: 2) What kinds of technical objects do you handle (for example, objects that can be
dismantled or used for different purposes in different production stages etc.)?
A:
Q: 3) How is information about technical objects organized and stored in your company (for
example, via EDV, file cards or no information at all)?
A:
1.1.1. Functional Location
Questions:
Q: 1) Do you manage objects that are immovable and that usually have a long
operational life (for example, clarification plants)?
A:
Q: 2) Do you require additional functionality to structure your maintenance objects?
A: [ ]Yes
[ ]No
R: 3) If yes, which objects need to be represented with functional locations?


Q: 4) What do the hierarchy levels of the functional locations represent (for example, cost
center levels, production process levels)?
A:
Q: 5) Is the hierarchy for functional locations structured according to spatial, functional or
technical viewpoints?
A:
Q: 6) How detailed should the functional location hierarchy be (for example, number of
levels, installation and dismantling of equipment)?
A:
Q: 7) At what level(s) of the hierarchy should data be entered?
A:
Q: 8) How detailed should the last level of the hierarchy for functional locations be?
A:
Q: 9) Is it sometimes the case in your company that functional location numbers change (for
example, if you assign part of a technical system to another technical system)?
A:
Q: 10) Do you need to assign different numbers to functional locations (for example, (a) from
a procedural perspective and (b) from a measurement/control system perspective)?
A:
Q: 11) How should the different levels be linked together with regard to the transfer of
data?
A:
Q: 12) Do you need to link documents to functional locations?
A: [ ]Yes
[ ]No
R: 13) Do you need to record the performance of functional locations using measuring
points and counters?
A: [ ]Yes
[ ]No

Q: 14) If yes, is counter reading data transferred between the different levels?
A: [ ]Yes
[ ]No
R: 15) Do you track warranties? If yes, are you a guarantor, a warrantee, or both?
A:
Q: 16) Do you want to obtain a note on the warranty automatically for a positive
warranty check result?
A:
Q: 17) Do you classify functional locations? If yes, how?
A:
Q: 18) Do you want to analyze what influence the usage conditions have on the
susceptibility to damage of the installed equipment?
A:
Q: 19) Do you need to document your technical objects according to their usage time for
functional locations?
A:
Q: 20) Do you determine the business partners (internal and/or external) whose
address(es) you require, if you need maintenance requests for a particular functional
location?
A:
Q: 21) Do you want to archive master records for functional locations? If yes, provide a copy
of your document archiving procedure. If this is not available, describe specific archiving
requirements.
A:
Q: 22) Do you want to make the screen templates for processing technical objects
(functional location, equipment) user-specific?
A:

1.1.2. Equipment
Questions:
Q: 1) Which maintenance objects must be entered as equipment master data?
A
Q: 2) List and describe the different categories of equipment that you maintain.
A:
Q: 3) How many pieces of equipment do you expect to manage in your system?
A:
Q: 4) Is each individual piece of equipment in your company identified by a serial
number (by your production department and/or by the manufacturer)?
A:
Q: 5) Do you want to create your own serial numbers or do you use the serial number of the
manufacturer as a reference/key for that object?
A:
Q: 6) If you use serial numbers, on which level do you want to track their history
(including costing, statistics, and so on)?
A:
Q: 7) Does your equipment include particular assemblies that you want to handle
individually in order to perform damage and cost analyses? Describe them.
A:
Q: 8) Do you represent the different types of equipment using material master records in
conjunction with Materials Management (for example, inventory management, goods
movements)?
A: [ ]Yes
[ ]No
R: 9) Does your equipment include larger components that you want to handle
individually, in order to create damage and cost analyses for them?
A:

Q: 10) Specify business partners (internal and/or external) for whom you require an
address when you need maintenance requests for a particular piece of equipment.
A:
Q: 11) Add other partners to the list, if necessary.
A:
Q: 12) Do you need to link documents (for example, drawings, manuals) to equipment
master records? If yes, give some examples.
A: [ ]Yes
[ ]No
R: 13) Do you measure and log the current condition of the equipment in the system
(for example, temperature, pressure, operating time)? If yes, describe the measuring points
and counters, which you use for different pieces of equipment.
A:
Q: 14) Do you track warranties? If yes, are you a guarantor, a warrantee, or both?
A:
Q: 15) Describe the different warranties for your equipment, and specify whether these
should be recorded individually for each piece of equipment.
A:
Q: 16) Do you want to obtain a note on the warranty automatically for a positive
warranty check result?
A:
Q: 17) Does a technician in your company require a special work permit before starting work
on specific equipment?
A:
Q: 18) Does old data (for example, equipment master records, repair histories or
information about technical objects) have to transferred? Give a typical example.
A:
Q: 19) Do you classify equipment? If yes, how?
A:

Q: 20) Are some pieces of equipment created as production resources/tools?
A: [ ]Yes
[ ]No
R: 21) Which changes to equipment do you want to document with a usage list?
A
Q: 22) Do you want to make the screen templates for processing technical objects
(functional location, equipment) user-specific?
A:
Q: 23) Do you want to generate/change a related asset automatically when
creating/changing a piece of equipment, and/or vice-versa?
A:
Q: 24) Do you want to archive equipment master records? If yes, provide a copy of your
document archiving procedure. If this is not available, describe specific archiving
requirements.
A:
1.1.3. Fleet Object
Questions:
Q: 1) Which maintenance objects must be entered as equipment master data?
A:
Q: 2) List and describe the different categories of equipment that you maintain.
A:
Q: 3) How many pieces of equipment do you expect to manage in your system?
A:
Q: 4) Is each individual piece of equipment in your company identified by a serial
number (by your production department and/or by the manufacturer)?
A:

Q: 5) Do you want to create your own serial numbers or do you use the serial number of the
manufacturer as a reference/key for that object?
A:
Q: 6) If you use serial numbers, on which level do you want to track their history
(including costing, statistics, and so on)?
A:
Q: 7) Does your equipment include particular assemblies that you want to handle
individually in order to perform damage and cost analyses? Describe them.
A:
Q: 8) Do you represent the different types of equipment using material master records in
conjunction with Materials Management (for example, inventory management, goods
movements)?
A: [ ]Yes
[ ]No
R: 9) Does your equipment include larger components that you want to handle
individually, in order to create damage and cost analyses for them?
A:
Q: 10) Specify business partners (internal and/or external) for whom you require an
address when you need maintenance requests for a particular piece of equipment.
A:
Q: 11) Add other partners to the list, if necessary.
A:
Q: 12) Do you need to link documents (for example, drawings, manuals) to equipment
master records? If yes, give some examples.
A: [ ]Yes
[ ]No
R: 13) Do you measure and log the current condition of the equipment in the system
(for example, temperature, pressure, operating time)? If yes, describe the measuring points
and counters, which you use for different pieces of equipment.
A:

Q: 14) Do you track warranties? If yes, are you a guarantor, a warrantee, or both?
A:
Q: 15) Describe the different warranties for your equipment, and specify whether these
should be recorded individually for each piece of equipment.
A:
Q: 16) Do you want to obtain a note on the warranty automatically for a positive
warranty check result?
A:
Q: 17) Does a technician in your company require a special work permit before starting work
on specific equipment?
A:
Q: 18) Does old data (for example, equipment master records, repair histories or
information about technical objects) have to transferred? Give a typical example.
A:
Q: 19) Do you classify equipment? If yes, how?
A:
Q: 20) Which changes to equipment do you want to document with a usage list?
A:
Q: 21) Do you want to make the screen templates for processing technical objects
(functional location, equipment) user-specific?
A:
Q: 22) Do you want to archive equipment master records? If yes, provide a copy of your
document archiving procedure. If this is not available, describe specific archiving
requirements.
A:
Q: 23) Which types of fleet objects do you want to manage?
A:

Q: 24) Which data do you want to see/maintain within the fleet object?
A:
Q: 25) Which types of utilities and consumables do you want to maintain?
A:
Q: 26) For what purpose do you intend to use your fleet objects?
A:
Q: 27) Which engine types do your fleet objects have? Do you want to maintain these?
A:
Q: 28) Which unit of consumption do you require?
A:
Q: 29) Which counter types do you require (for example, kilometer counter,
consumption counter, time counter and so on)?
A:
Q: 30) How do you want to name your counters?
A:
Q: 31) How do you want to calculate your consumption?
A:
1.1.4. Production Resource/Tool as Equipment
Questions:
Q: 1) Do you want to make the screen templates for processing technical objects
(functional location, equipment) user-specific?
A:
Q: 2) Do you want to generate/change a related asset automatically when
creating/changing a piece of equipment, and/or vice-versa?
A:
[SBR Softtech Questionaries’ to Client PM]
Q: 3) What kind of production resources/tools do you require?
A:
Q: 4) Do you want to manage your production resources/tools by quantity alone or also
based on localization, value, responsible person etc.?
A:
Q: 5) Do you use production resources/tools which have to be checked or calibrated
regularly?
A:
1.1.5. Reference Functional Location
Questions:
Q: 1) Do you have many similar technical structures in your organization?
A:
Q: 2) Do you have standardized functional location structures that should be
represented as reference functional locations?
A: [ ]Yes
[ ]No
R: 3) According to which criteria do you intend to structure your functional
location hierarchies (for example geographical, functional or technical aspects)?
A:
1.1.6. Bill of Material for Functional Location
Questions:
Q: 1) Will you use functional location BOMs?
A: [ ]Yes
[ ]No
R: 2) How are they structured?

Q: 3) Will you need to use engineering change management to control BOM changes?
A: [ ]Yes
[ ]No
1.1.7. Equipment Bill of Material
Questions:
Q: 1) Do you have structures for special sub-items?
A: [ ]Yes
[ ]No
R: 2) If yes, are they pieces of equipment that you want to trace on monitor?
A: [ ]Yes
[ ]No
R: 3) If you use equipment hierarchies, describe some examples of when and how
they are structured.
A:
Q: 4) Does your equipment include larger components that you want to handle
individually, in order to create damage and cost analyses for them?
A:
Q: 5) Do you currently have equipment BOMs (spare parts lists)?
A: [ ]Yes
[ ]No
R: 6) If so, are they stored electronically?
A: [ ]Yes
[ ]No
R: 7) How are equipment BOMs structured?
A:
Q: 8) How are BOMs linked to equipment masters?
A

Q: 9) Will you need to use Engineering Change Management to manage your BOMs?
A: [ ]Yes
[ ]No
Q: 10) Do you also construct BOMs with alternative materials?
A: [ ]Yes
[ ]No
Q: 11) Do you use variant configuration?
A: [ ]Yes
[ ]No
1.1.8. Object Link
Questions:
Q: 1) Do you want to define and represent horizontal object links? A:
Q: 2) If so, for which of the following objects do you want to display the links? A:
Q: 3) Which types of relationship exist between the linked objects (1:1, 1:n, n:n)? A:
1.1.9. Installed Base
Questions:
Q: 1) Do you want to use IBase management (a) purely for documentation and management
of an object structure (ie. a production process) or (b) as a limited substitute for bills of
material?
A:
Q: 2) Which object types are part of your installed base hierarchy?
A:

1.2. Task Lists
Questions:
Q: 1) Do you have work plans for service tasks in your current IT system or databases?
A:
Q: 2) Do you want to archive maintenance task lists? If so, please provide a copy of your
document archiving policy if available. If this is not available, please describe specific
archiving requirements.
A:
1.2.1. General Task List
Questions:
Q: 1) Do you require configurable task lists?
A:
Q: 2) Do you classify general task lists? If yes, how?
A:
Q: 3) How do you group your general task lists?
A:
1.3. Maintenance Plans
Questions:
Q: 1) How will you create maintenance plans (e.g., representing individual maintenance
items or by grouping a number of maintenance items)?
A:
Q: 2) Will you plan the preventive maintenance separatly for each maintenance equipment or
will you establish a preventive maintenance plan for a group of maintenance objects (e.g., one
plan for a production line that consists of several pieces of equipment)?
A:

Q: 3) Do you have different frequencies for the execution of your maintenance tasks and
would you like to have all of them in just one maintenance plan?
A:
Q: 4) If the maintanence plans generate service entry sheets for a MM external
management, should they be directly created by the plans or after the orders are
created/released?
A:
Q: 5) For what types of service object do you create maintenance items?
A:
Q: 6) Will you have pre-defined activity lists (task lists) for your different preventive
maintenance services that list the required work steps (including estimated work time),
spare parts and/or tools?
A:
Q: 7) If yes, are those activity lists specific for the different equipment types (machine
types) or different functional locations for which you offer preventive maintenance?
A:
Q: 8) Do you want to archive maintenance plans? If so, please provide a copy of your
document archiving policy if available. If this is not available, please describe specific
archiving requirements.
A:
1.3.1. Single Cycle Plan
Questions:
Q: 1) What criterion is the maintenance cycle based on for the single cycle maintenance
plan?
A:
Q: 2) What character does the cycle have?
A:

1.3.2. Multiple Counter Plan
Questions:
Q: 1) Should just performance- based (counter-based) or also time-based maintenance
cycles be integrated into the multiple counter-based maintenance plan?
A:
Q: 2) Do you use cycle sets for the attachment of multiple counter plans?
A:
Q: 3) Which counters for which technical objects (functional locations, equipment)
should be assigned to the individual maintenance cycles?
A:
Q: 4) Which time-base should be used (for example, calendar, factory calendar, key
dates)?
A:
Q: 5) If a preventive maintenance activity is completed early (before the planned date) or
late (after the planned date), do you then also shift the next planned preventive
maintenance activities for the same equipment?
A:
Q: 6) When should preventive maintenance tasks appear in your order backlog?
A:
Q: 7) List the different maintenance cycles, on which the scheduling of preventive
maintenance activities should be based.
A:
Q: 8) Do you want to plan maintenance independently of your hierarchy of technical
objects?
A:

1.3.3. Strategy Plan
Questions:
Q: 1) What criterion is the maintenance cycle based on for the strategy-based
maintenance plan?
A:
Q: 2) Which time-base should be used (for example, calendar, factory calendar, key
dates)?
A:
Q: 3) If a preventive maintenance activity is completed early (before the planned date) or
late (after the planned date), do you then also shift the next planned preventive
maintenance activities for the same equipment?
A:
Q: 4) When should preventive maintenance tasks appear in your order backlog?
A:
Q: 5) List the different maintenance cycles, on which the scheduling of preventive
maintenance activities should be based.
A:
Q: 6) Do you want to plan maintenance independently of your hierarchy of technical
objects?
A:
1.4. Solution Database
Questions:
Q: 1) Do you possess technical objects that are required for detailed technical
information in order to introduce necessary error handling?
A:
Q: 2) Is the offer of a solution database helpful for the notification processor?
A:
[SBR Softtech Questionaries’ to Client PM]
Q: 3) Do recurring problems constantly appear during notification processing that are
linked with a complex solution process?
A:
Q: 4) Is there a bottleneck in specialist knowledge in your area?
A:
Q: 5) Is error diagnosis an essential step in your area or is it "only" used for short-term error
handling?
A:
Q: 6) Are you already using (computer-supported) Help for error analysis and handling
based on a knowledge or error database?
A:
1.4.1. Symptom
Questions:
Q: 1) Structure existing problems based on criteria?
A:
1.5. Additional Master Data
1.5.1. Warranty
Questions:
Q: 1) Do you track warranties? If yes, are you a guarantor, a warrantee, or both?
A:
Q: 2) Which materials contain warranty agreements?
A:
Q: 3) To which objects should warranties be assigned?
A:

Q: 4) Describe the different warranties for your objects and specify whether these
should be listed individually for each object.
A:
Q: 5) What is the current procedure? Automatically or manually?
A:
Q: 6) Do you want to obtain a note on the warranty automatically for a positive warranty
check result?
A:
Q: 7) Which warranty counters are used?
A:
1.5.2. Counter/Measuring Point
Questions:
Q: 1) Do you need to record the performance of functional locations using measuring
points and counters?
A: [ ]Yes
[ ]No
R: 2) If yes, is counter reading data transferred between the different levels?
A: [ ]Yes
[ ]No
R: 3) Do you measure and log the current condition of the equipment in the system
(for example, temperature, pressure, operating time)? If yes, describe the measuring points
and counters, which you use for different pieces of equipment.
A:
Questions:
Q: 1) Is there any revision planned where a production line or plant has to be shut down for a
certain time?
A:

1.5.4. Catalog
Questions:
Q: 1) Do you want to create an inspection catalog of characteristic features, causes of
defects, and usage decisions that occur when maintenance work is executed?
A:
Q: 2) Describe your current catalogs and their structure.
A:
1.5.5. Permit
Questions:
Q: 1) Do you consider permits in connection with orders, for example, with regard to
working conditions or safety aspects? If yes, describe your permit procedures.
A:
Q: 2) If yes, who in your company is authorized to issue permits?
A:
C.Business Processes
1. Plant Maintenance
Questions:
Q: 1) Do you want to transfer the maintenance history from your current system to SAP R/3?
A:
Q: 2) If yes, to which of these objects should the data be transferred? A: [ ]
Historical orders
[ ] Work orders
[ ] Notifications (activity report)
R: 3) Could your maintenance organization operate as a profit center (as opposed to
a cost center)?
A:

Q: 4) How do you process maintenance costs (for example, settlement to cost center)?
A:
Q: 5) Is any part of your maintenance organization outsourced (or will it be in the
future)?
A:
Q: 6) Are certain maintenance activities always performed by external contractors? If yes,
describe these types of maintenance work.
A:
Q: 7) Do you want to set up a workflow for the processing of notifications and/or orders?
A:
1.1. Breakdown Maintenance Processing
1.1.1. Notification
1.1.1.1. Notification Creation/Processing
Questions:
Q: 1) Who in your organization is responsible for identifying maintenance work? A:
Q: 2) Who in your organization is responsible for processing identified work? A:
Q: 3) How do you prioritize identified work?
A:
Q: 4) Are you restricted to a certain period of time when executing these tasks?
A:
Q: 5) List the business partners (internal and/or external) whose address information you
require when creating the notification. Add other business partners, if necessary.
A:

Q: 6) Do you want to be able to process related notification and order data collectively
in a single form?
A:
Q: 7) Do you want information about the reference object displayed automatically when a
notification is created? If yes, what information?
A:
Q: 8) How do you describe a problem? Do you enter a verbal problem description or do you
use standardized codes, for example, to determine the damage, cause of damage, or object
part?
A:
Q: 9) Do you want to link digitalized documents to notifications?
A: [ ]Yes
[ ]No
Q: 10) Do you assign a responsible person to each task?
A:
Q: 11) Should the person responsible for a task be informed automatically by the
system?
A:
Q: 12) How do you want to configure the interface for your notification with regard to
control data, breakdown data, activity data, and task data?
A:
Q: 13) Do you have standard tasks that you always perform for different types of
notifications? If yes, please describe them in detail.
A:
Q: 14) Do you record the performed activities that solved the customer problem in a
standardized way (for example, using standardized codes) in order to evaluate possible
solutions for a problem?
A:
[SBR Softtech Questionaries’ to Client PM]
Q: 15) Do you want to set up an escalation workflow for notifications and tasks?
A:
Q: 16) Do you want to use paging in your company as an additional form of
communication?
A:
Q: 17) How and when are notifications completed?
A:
1.1.1.2. Task Definition
Questions:
Q: 1) How do you plan the processing of a maintenance notification? Do you use tasks
during processing?
A:
Q: 2) If you use notification tasks, give some examples.
A:
Q: 3) Who is responsible for performing a maintenance task?
A:
Q: 4) Do predefined follow-up tasks result automatically from completed tasks?
A:
Q: 5) Is there a set procedure for how you react to malfunctions?
A:
Q: 6) Do you perform maintenance work with or without entering costs?
A:

1.1.1.3. Notification Printing
Questions:
Q: 1) Do you print notifications?
A: [ ]Yes
[ ]No
Q: 2) Provide some examples of the output format(s) for notifications.
1.1.1.4. Entry of Technical Findings
Questions:
Q: 1) Do you record technical information (for example, which part of the equipment was
broken, damage, cause of damage) about a maintanence problem in order to create a
service history or to enable further evaluations?
A: [ ]Yes
[ ]No
Q: 2) Which technical data should be recorded and who is responsible?
A:
Q: 3) When do you document technical findings?
A:
Q: 4) Do you want to have a coding system, which allows standardized entry of technical
information? If yes, list the different categories (for example, damage), for which you want to
have codes.
A:
1.1.1.5. Notification Archiving
Questions:
Q: 1) Describe your specific archiving requirements.
A:
Q: 2) Do you want to archive notifications? If so, provide a copy of your document
archiving policy. If this is not available, please describe specific archiving requirements.
A:
[SBR Softtech Questionaries’ to Client PM]

Monday, 20 May 2013

Implementation Questionaries to Client related to Project System


Project management - 
1) Will you be using the PS module?
2) Describe how your project processing should look, divided into phases.
3) What triggers creation of a project?

Customer inquiry & quotation

1) Have you installed the Sales and Distribution module?

Project Planning
1) How detailed is your project planning? (Remember that there are different levels of planning detail)

Cost Planning
1) Do you track costs for your projects?
2) Do you focus only on dates and capacities?
 3) Do you plan costs by period and distribute these costs according to the project schedule?

Dates Planning
1) Do your projects involve extensive scheduling?

Materials
1) Describe how you currently procure materials for your projects.
2) Do you assign materials manually?
3) Do you plan/specify materials by material number?

Plan Periodic Processing
1) Currently, do you record your cost of sales and WIP automatically today?

Plan Periodic Repositing

1) Do you periodically move costs from a project/cost center (such as telephone costs) to other projects/cost centers?

Result Analysis
1) Do you use result analysis to forecast your work in process (WIP) and cost of sales (COS) or do you simulate them?

Reporting
1) which tools do you have available for reporting?
2) What are all the types of reports u get?

Project monitoring and controlling
1) on what aspects do you monitor project progress (labor, cost, dates, finance, progress

Actual Settlement
1) what are the dependencies between your project actuals and your cost center actuals?
2) It is possible to settle actual values between projects and cost centers. What is the relationship between work performed by cost centers on projects and non-project work?

Final Settlement
1) How do you ensure that all project costs have been received and paid?

Closing
1) when in your project life cycle cans you decide to close a project

Project Completion
1) Do you have requirements from a company guideline when closing a project?
2) What legal requirements do you have to follow when closing a project?

Documentation
1) Do you have a business process for tracking relevant customer documentation throughout the project?
2) Do you have a standard project scope documentation process?

Project Archiving
1) How long do you need access to your project in the production system?
2) How do you store old projects?

Implementation Questionaries to Client related to FI/CO


A.      Organization

1.   Cross-application/central organizational units


Company

Questions:

Q:     1) Do you want to structure the company into one or more separate legal entities?


Q:     2) Do you have foreign companies?



Q:     3) Which companies are going to work with which chart of account?

A:

Q:     4) In which currencies are the transactions posted in the companies?
A:   


Q: 5) Are all companies managed in FI company codes, and is FI integration used? A:

1.3.              Company Code

Questions:

Q:     1) Which legal entities (company codes) will you have and in which countries?


A:

Q:     2) What are the legal reporting requirements that these companies have to comply with?

A:


Q: 3) Which companies are required to use a statutory chart of accounts for reporting purposes?

A:

Q:     4) Do all companies use the same operating chart of accounts?

A:   



Q: 10) For which enterprise entities that are not independent legal entities do you require sub ledgers (accounts payable ledger, accounts receivable ledger, asset accounting and so on)? For example, fixed assets per strategic business unit.

A

1.4.              Business Area

Questions:

Q: 1) For which enterprise entities do you wish to create individual internal balance sheets and/or profit and loss statements or other internal reports? Please provide details of your reporting requirements.

A:

Q: 2) Are there entities within your enterprise that are not independent legal entities, but that you treat as independent legal entities?

A


Q: 4) Does the organization have to produce segmented financial statements for public reporting (e.g. FAS-14 in the US)?


A:


1.5.          Functional Area

Questions:

Q: 1) Do you need to structure the profit and loss statement according to functional areas (cost of sales accounting) such as production, sales, marketing?

A:   

Q:     2) Which functional areas do you use for your rendering of accounts?

A:

Q:     3) How do you determine functional areas? For example, do you derive them from the cost centers?

A:  

1.6.              Financial Management Area

Questions:

Q:     1) Which financial management (FM) areas do you want to use?

A:

Q: 2) Do you require financial evaluations for individual company codes or across several company codes?

A:   


Q:     3) Which leading currency should be used for financial evaluations?

A:   

Q:     4) At which intervals do you evaluate planned and actual values (months, weeks, etc.)?



1.7.              Controlling Area

Questions:

Q: 1) Are you using one centralized controlling system or do you follow a decentralized approach with several independent controlling systems?


A:


Q: 2) Provided that company codes use the same chart of accounts and fiscal year variant, which company code(s) do you want to assign to your controlling area(s)?

A:  


Q: 4) Only if you intend to use profit centers: Should your organization belong to one profit center grouping even if you intend to use multiple controlling areas?

A:


Q: 5) If you wish to have unified Controlling, which currency or currencies are you planning to use?

A:   


Q:     6) On which currencies should your Controlling be based?

A:   


  
Q:     7) Which companies are going to work with which chart of account?

A:

1.8.              Profit Center

Questions:

Q: 1) Which criteria do you use for dividing your organization into internal areas of responsibility?

A:   


Q: 2) Do you want to structure your profit center accounting using the cost-of-sales method (revenue minus cost-of-sales), or using period accounting (all revenues minus all costs incurred in the period +/- inventory changes)?

A:  


Q: 3) Can you make unique profit center assignments for the following master data: material/plant, cost center, sales order item (validation/substitution), PSP elements, cost objects, internal orders?

A:


Q: 4) Besides the "true" profit centers are you using any other profit centers that render services for various other profit centers?

A:  


Q: 5) In case you need alternative internal views on your company‟s profits not covered yet within the profit center standard hierarchy please specify additional groups/hierarchies for them. (Organization Structure)

A:


Q: 7) Are the Profit Centers (e.g. in regional classification) only charged from certain company codes?

A:  


Q: 8) Do you want Consolidation (EC-CS) to be based on Profit Center Accounting (management-oriented consolidation)?

A:  


   
1.9.              Plant

Questions:

Q:     1) Are all plants in the same country? List the plants and countries.

A:

Q:     2) Will negative Stocks be allowed in any plants?   If yes, specify the plants.

A


Q: 3) Do you need special plants for your maintenance work apart from the common logistics plants?

A:   


Q:     6) Outline all facilities/locations that create, distribute, or store inventory.

A:  

Q:     8) At which level should the balances be assigned to the organizational units?

A:    


2.   Procurement

2.1.              Purchasing Group

Questions:

Q: 1) Shall purchasing groups represent individual buyers or groups of buyers? If groups of buyers, provide a list of groups.

A:
.

Q:     2) Provide a list of buyer names.

A:   


2.2.              Purchasing Organization

Questions:

Q:     1) Which purchasing departments exist in your enterprise?

A:




Q: 2) If there is more than one department that handles all purchasing, specify which department(s) negotiates pricing terms and conditions with your suppliers.

A


Q: 3) Do you have departments outside your purchasing department, which handle purchasing? If so, list these departments and what they purchase.

A:



Q: 4) How do the departments share the task of procuring the goods and services required by the organization?

A:

Q:     5) Where do you procure materials/services in your enterprise?


Q:     6) Which materials/services do you procure?

A:   


Q: 7) For which enterprise entities do you procure materials/services? List these materials/services.

A: 



Q:     8) Do you have corporate and localized purchasing functions?

A:


Q:     9) Do you negotiate vendor pricing at a corporate or local level?

A:


Q:     10) Where do you procure materials/services in your enterprise centrally?

A

Q:     11) Which materials/services do you procure centrally?

A:   


Q: 12) For which enterprise areas do you procure materials/external services centrally? List these materials/services.

A:   





Q: 13) Where do you negotiate centrally agreed contracts for the purchase of materials/services in your enterprise?

A

Q:     14) For which materials/external services do you negotiate framework contracts?

A

Q:     15) Which enterprise entities can release orders against these contracts?

A

Q: 16) Do you want to have procurement in particular enterprise areas/business areas or product groups separated?

A

3.   Sales and Distribution

3.1.          Sales Area

Questions:

Q: 1) Do you need to keep the sales activities of particular enterprise areas/business areas or product groups completely separate?

A:

Q: 4) How is billing handled on each campus? Is it centralized for UT, centralized for each campus or something else?

A:

Q:     5) How do you distinguish which projects belong to which campus?

A:


3.2.          Sales organization

Questions:

Q: 1) Who is responsible for sales-related components in the material and customer master data?

A:

Q: 2) Is a customer assigned to one sales unit or can he be addressed by several sales units?





4.   Project management



Q:     2) Do your projects sometimes span multiple company codes?

A


Q: 5) The object class is used for reconciliation purposes. Which object classes are relevant for your projects?

A:   


Q: 6) The business area on a WBS element must be associated with the company code on the WBS element. Do your projects/WBS elements span multiple business areas?

A:   

Q: 7) Projects cannot span more than one controlling area. Describe your accounting for inter-company entries.

A:    .


Q: 8) Do you want to track specific currencies on your project other than the controlling area and company code currency?

A:   

Q: 9) It is only possible to reference one profit center on a WBS element. Do you have reporting requirements for profit center accounting that will impact your project structure?

A:


4.1.              WBS Element Applicant

Questions:

Q: 1) Do you assign a person to your WBS element other than the project manager? (If yes, consider using the applicant to track assignments such as project sponsor, project administrator or project accountant.)



4.2.          Person Responsible for WBS Element

Questions:

Q: 1) Do you assign responsible people (project managers) to your WBS elements? (If yes, use the "Responsible person" field. If you use this field in the project definition, the WBS elements inherit the value entered there.)

A:


5.  Financial Accounting

5.1.          Chart of Accounts

Questions:

Q:     1) Which companies use the same chart of accounts?

A:.


Q:     2) How many natural accounts will each chart of accounts contain (estimated)?

A:   


Q:     3) What is the document numbering logic?


Q: 4) Describe how the account number is set up (for example: department, natural account).

A:

Q:     5) Will the chart of accounts need to be approved?   If so, by whom?

A:   

Q:     6) Which maintenance language should be used for each chart of accounts?

A:   

Q:     7) Which additional languages do you wish to use for your charts of accounts?

A:    None


Q:     8) Please provide your current Chart of Accounts.

A:





6.   Treasury

6.1.              Treasury

Questions:

Q:     1) Are bank statements automated, or manually processed

A:   

Q:     2) How is liquidity managed?

A:    .


Q:     3) How are cash inflows and outflows managed?

A:   


Q:     4) Are lockboxes utilized?

A:   


Q:     5) Are checks deposited manually, or electronically?

A:   


Q: 6) Is a bill of exchange utilized as a form of short-term financing? A bill of exchange is an instrument used for financing. A customer pays an invoice using a bill of exchange transaction and is therefore able to extend his or her payment period. You can then discount this bill of exchange and factor it to another party.

A:     

7.   Enterprise Controlling

7.1.              Dimensions

Questions:

Q:     1) Which consolidation types do you want to set?


Q:     2) Define the dimensions that you want in the system.


7.2.              Currencies (Consolidation)

Questions:

Q:     1) In which currencies do you want to the reports generated?

A: